- Take down commercial and light industrial structures to engineered sequence drawings, 20+ buildings completed
- Operate mini excavators, skid steers and hydraulic breakers, plus shear and grapple attachments
- Segregate steel, concrete and timber for recycling, achieving 80%+ diversion from landfill on most jobs
Demolition Worker Resume Example
Demolition is sequencing and hazard control, not just breaking things. Contractors read for the structure types you have taken down, the equipment you have run, and your training around dust, silica and hazardous materials found on site.
Summary
Demolition worker with 7 years on selective interior strip-outs and structural demolition. Runs skid steers and mini excavators, works to engineered demolition sequences and holds 40-hour HAZWOPER for contaminated sites.
Experience
- Carried out selective interior strip-outs in occupied buildings with dust containment and negative air
- Assisted with utility isolation checks and pre-demolition surveys before work began
Skills
Education
Certifications
- OSHA 40-Hour HAZWOPER (29 CFR 1910.120)
- OSHA 30-Hour Construction
- Asbestos Awareness Training
- Respirable Crystalline Silica Awareness (OSHA 1926.1153)
Here is how to write your own, and what actually gets you the call in this trade.
What a foreman looks at first
The first pass answers two practical questions: can you legally do this work, and are you free to start. A foreman with a job beginning next week reads for the licence, the current tickets and the availability, and everything else on the page waits behind those.
Licences, tickets and safety training
Demolition work itself is generally unlicensed for the worker, with contractor licensing set by state. Training is what gates the work: OSHA 30-Hour Construction, asbestos and lead awareness, silica awareness, and 40-hour HAZWOPER for sites with hazardous substances. Equipment operator training is employer or manufacturer issued. Anything involving explosives is separately licensed and strictly regulated.
How you actually get hired for this
Demolition contractors want to know what you can run and what you can be trusted around. Equipment and attachments come first, because a worker who can operate a mini excavator with a shear is a different hire from a labourer. Employers then ask about sequencing, shoring and utility isolation, and about hazardous material training, since pre-demolition surveys routinely find asbestos and lead. Recycling and segregation experience is increasingly asked about.
What you built, at what scale, safely
Describe the work in the units the trade uses: square footage, linear feet, tonnage, service calls per day, machines run, crew size. Add safety record and callback rate if you have them, because on a job site those are worth as much as speed. If you have run a crew or trained apprentices, say so plainly — that is the difference between a hand and a lead.
Mistakes that cost demolition worker candidates interviews
- Describing demolition as labouring only, hiding the equipment you can run
- No hazardous material training listed, which restricts the sites you can enter
- Missing the sequencing and isolation side, which is what keeps the work legal
The top of the page: licence, tickets and what you can run
A foreman reading this has a job starting Monday. Put your licence class, your certifications with their dates, and the equipment you can operate at the very top — above the work history — because that is the information that decides whether you get the call. Save the paragraph-style summary for one or two lines at most.
Moving up in this trade
Labourer to operator to demolition foreman, then site superintendent or project manager for a demolition contractor. Moving into environmental remediation or salvage and recycling operations is a common sideways step.
Before you send it
Check every certification date is current and every licence number is right, since these are verified and an expired ticket ends an application. Keep the file simple: one column, no graphics, no tables. Our free ATS checker will confirm it parses, which matters because large contractors and staffing agencies screen automatically.
More Examples in This Field
Demolition Worker Resume Questions
What should a demolition worker resume include?
Licence class, current tickets with their dates, and the equipment you can operate — all of it above the work history — then jobs described in the units the trade uses, your safety record, and any crew or apprentice responsibility. One page, one column, no graphics.
What certifications do I need on a demolition worker resume?
Which tickets are required depends on the trade, the jurisdiction and the site, and the posting sets it out. Whatever you hold matters more than anything else on the page, so list every one with its issue and expiry date — these are verified, and an expired certification ends an application regardless of the work history behind it.
How is hiring for demolition worker roles different?
Hiring in the trades is fast and often informal — a call, a short conversation, sometimes a day on site to see how you work. Referral and reputation count for more than in most fields, so how you leave one job affects the next one.
What do hiring managers look at first on a demolition worker resume?
Your licence class, your current tickets, and when you can start. A foreman with a job beginning next week reads for whether you are legally able to do the work and free to do it, and the rest of the page waits behind those two answers.
Where does a demolition worker career usually go next?
The usual route runs from apprentice to journey level to lead hand or foreman, and from there into supervision, estimating or running your own work. Crew leadership and apprentice training are the lines that show you are ready for that step.
How long should this resume be?
One page. Employers in this field read quickly and often on a phone, and a second page rarely gets opened. Cut old short-term roles before you cut certifications or equipment experience.
Can I use this example as a template?
Use the structure and the way each achievement is phrased, but write your own content. The names and employers here are fictional, and a resume describing work you did not do will not survive an interview.
Build Your Demolition Worker Resume
Start from this layout, edit in a live preview with an ATS score as you type, and download as PDF, Word or image — free.
Use This Example — Free